Friday, January 19, 2007

schedule.


J.22
a rough sight model and cad drawings
rough concept drawings.
visiting my site.

J.25
diagrams based on the concept and site conditions. for specific gesture.
development the concept drawings

J.29
develop the diagram and study model (1-32 or 1-16)
details

F.1 develop all

F.5
Everything will be completed.

Plans, Sections ,elevations ,Interior Elevations at 1/8"=1’-0”.
and Perspectives.

Models
study model at 1/16(or 32")”=1’-0”. Started.
Final Project Model 1/8”=1’-0”
Detail model at 1/2"=1’-0” or full scale.

No comments: