REVISED SCHEDULE
THURS 25:
PROGRAM. Think about what specifics program will adhere to; categorization of objects in the flea market may be needed - for example, market in san jose (?) has roads and areas within that lead to a produce district, antique district, clothing district, etc. so people know exactly where to go to find what they seek, while market such as that along highway 127 has objects more scattered in a yard sale, where objects on display along the road are visited based on luck. (an example of something i need to figure out, not that there aren't more things to solve). Have diagram(s) finished. DETAIL MODEL. Drawing(s) or studies of model. SITE. Choose two sites.
MON 29:
DETAIL MODEL. Start building full-scale model. PROGRAM. Sketch model or drawing of layout.
SITE. Have 3 sites documented in 1/16th site plans and photographs.
THURS 1:
DETAIL MODEL. Continue building model. Drawing with objects photographs collaged (shows context of detail). Corresponding text. PROGRAM. Sketch model/drawing continued.
MON 5:
will have completed..
SITE: 3 chosen sites at different scales. Photographs, 1/16” site plans.
PROGRAM: Categorization of objects and corresponding display units in diagram(s). Program requirements determined. Sketch models?
DETAIL MODEL: Studies, drawing with object photographs collaged, text, finished full-scale installation model.
No comments:
Post a Comment